Brownfield Engineering Projects
Project Title
Award Date
Scope Type
Road Crossing study
2023 -2024
Review of Train 3 Amine content. Where did the 0.01% limit originate, is it really the maximum limit, and is there a readily identifiable reason why Train 3 is at over 4%. Update the graph.
2024
Review our conclusion on 2 phase vs 3 phase separator and provide detailed explanation of why we do or do not recommend.
2024
Review benefits of new BTEX cooler and combuster in lieu of the separator/filter solution. Provide summary of why this is or is not an acceptable approach.
2024
Excel matrix or train 1 and 2 issues and the specific resolutions recommended to resolve them.
2024
Mist Evaluation
2024
Air permit and combustor sizing update
2024
MIP for reciprocating compressors
2024
Powerpoint presentation to accompany MIP bid in Houston to justify the need for the MIP.
2024
Welcome to Golden Inlet Control Valve size and spec
2024
Need 3D model from Dan for Welcome to Golden.
2024
Find out from supply chain if written spec for TEG/Amine purity, if nothing exists OR to write and provide that spec.
2024
Provide remaining datasheets and drawings package for TEG Inlet Coalescer package other than what was provided for budget Construction estimate RFP from SEAN LYNCH.
2024
Provide P&IDs, gas composition, air permit, and any available sampled process data from produced water tanks for King George compressor station to perform combustor analysis and review.
2024
Source 2.5MMBTU/hr TEG Reboiler as replacement for dmaged existing reboiler.
2024
Provide field engineering team to identify damage to the TEG system and evaluate what components of the pipe rack, pipe, and electrical/control systems need to be repaired, demo'd and replaced.
2024
Provide cost estimate to 3D Scan the TEG System on site to facilitate a 3D model for upcoming modifications.
2024
Provide cost estimate for IFC engineering package for repairs to the damaged TEG System.
2024
Provide list of sources/vendors in contact with for TEG Reboiler replacement
2024
Provide sizing for PSV on added TEG Filter Coalescer
2024